Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHill of Easterton Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Hill of Easterton Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Hill of Easterton Wind Farm (Wind , Active) Location in the UK : Scotland, Aberdeenshire Type of installation: Wind on/offshore: on Turbines :3 Capacity : 2.5 MW Approx Date of 1st power generation: July 2007
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Mackies Dairy
Ice cream manufacturers Mackie's of Scotland have their own energy supply - three Vestas V52 wind turbines - referred to as "Mackie's", "Ice" and "Cream". Each of these graceful machines have a 45 metre turbine and three 25 metre blades on the turning propeller and capacity to produce 850KW of power - so a total capacity at the farm of 2.5 MW.
Wind turbines are not a new sight on the farm, Mac's father Maitland previously installed a smaller turbine which powered the business's former piggery unit until 1997. That was one of the first grid connected wind turbines in the UK but did not have a very large output. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Subscribed version includes full address details of project site Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects) Subscriber Register Subscribed version includes access to DECC data where it exists for this project. Also facility to include a mix of DECC data within csv downloads Subscriber Register Subscribed version includes access to OFGEM data where it exists for this project. Also facility to include a mix of OFGEM data within csv downloads Subscriber Register
Capacity: 2.55 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 20/08/2022 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Edinburgh Airport's plan to build solar farm an eleven-acre solar farm is set to be constructed on our airfield. Work will get underway later this year, and the project is forecast to be completed in March 2023. Source: edinburgh airport, Date and Time of entry: 19 August 2022 00:00
Studley Solar Farm Enso Energy is proposing to develop a solar farm and battery
storage facility on land adjacent to Studley Farm, Atworth,
Melksham. Source: enso, Date and Time of entry: 19 August 2022 00:00
Aldenham Another planning application has been lodged for the solar farm. Please look at the new plans and make your comments to Hertsmere Planning Dept. Solar Farm – 22/0948/FULEI Source: aldenham pc, Date and Time of entry: 19 August 2022 00:00
Aldenham Aldenham Estate owner on why she wants to see solar farm on her land Source: watfordobserver, Date and Time of entry: 19 August 2022 00:00
Proposal for a new solar energy & battery storage farm We submitted an application for a Development Consent Order (DCO) for Longfield Solar Farm to the Planning Inspectorate (PINS) on 28 February 2022. This was accepted for Examination on 28 March 2022. Source: longfield, Date and Time of entry: 19 August 2022 00:00
|
|
©2017
Simon Mallett |
|