Hill of Balquhindachy Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Hill of Balquhindachy Wind Farm and local projects displayed.

( Subscribe for Β£100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for Β£500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Hill of Balquhindachy Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Aberdeenshire    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 2.55 MW
Approx Date of 1st power generation: July 2007

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Wind Farm developed in 2 stages. 1st stage with 1 wind turbine, 2nd stage added a further 2 turbines.
(2008) Greenspan Electric’s wind turbine at Hill of Balquhindachy has been operational for a year. The Vestas 850 kW turbine generated over 2,500 MWh of green electricity over the twelve months, all of which was bought by Marks and Spencer plc to offset the power used in their Eco-store in Pollok. Over the course of the year, the turbine has offset over 2,000 tonnes of CO2 that would have been emitted by a conventional power station generating the same amount of electricity.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Hill of Balquhindachy Wind Turbine - A (29/03/07) Balquhindachy Methlick Ellon AB41 7BY Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Hill of Balquhindachy )

 DECC Data on this Project: Hill of Balquhindachy :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hill of Balquhindachy extension     1.7 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 2758 / AA061     District:
Applicant: Private Developer     Application : APP/2007/1191 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 0.84999999999999998
Height of Turbines: Calculated capacity: 1.7
Site Address: Methlick, Ellon
  AB41 7BY
County: Grampian Region: Scotland
OS Coordinates: 385642 / 385642
Development Status: Operational
Application Submitted: 3/20/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 7/9/2010 This Record Last Updated: 6/1/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hill of Balquhindachy: Wind : -na-

 Calculations


Capacity: 5.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/19/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.1 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 351716

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School