vid = 2061pws_id = 371457pws_id = 371457
Not Logged on, Max pages: 5( 1 Seen ) ID:1969 Ind:1 IP: 54.81.116.187YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Standford Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Standford Hill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Standford Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Eastchurch, Sheppy    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 4.6 MW
Approx Date of 1st power generation: January 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The proposal for two wind turbines on Ministry of Justice land was granted planning permission by Swale Borough Councils Planning Committee in June 2011. The construction period is expected to take 5-6 months, with commissioning of the turbines expected in January 2013.
The Community Fund for the Standford Hill wind energy development will amount to at least 11,500 per year (index linked) for the lifetime of the project, normally 25 years.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Standford Hill DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Standford Hill : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 4.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 25/04/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.6 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 371457


Weather Station Name : Faversham Latitude: 51.2965 Longitude: 0.8796 Elevation: 46

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
24/04/2018 18:00:00SW 16 5 / 31 0.215 0.992.97
24/04/2018 21:00:00SW 16 5 / 31 0.215 0.995.94
25/04/2018WSW 16 5 / 31 0.215 0.998.91
25/04/2018 03:00:00W 11 5 / 31 8.91
25/04/2018 06:00:00WSW 11 5 / 31 8.91
25/04/2018 09:00:00W 11 5 / 31 8.91
25/04/2018 12:00:00WSW 16 5 / 31 0.215 0.9911.88
25/04/2018 15:00:00WSW 18 5 / 31 0.305 1.4016.08
25/04/2018 18:00:00WSW 13 5 / 31 0.081 0.3717.19
25/04/2018 21:00:00WSW 13 5 / 31 0.081 0.3718.3
26/04/2018WSW 13 5 / 31 0.081 0.3719.41
26/04/2018 03:00:00WSW 13 5 / 31 0.081 0.3720.52
26/04/2018 06:00:00WSW 13 5 / 31 0.081 0.3721.63
26/04/2018 09:00:00W 16 5 / 31 0.215 0.9924.6
26/04/2018 12:00:00WSW 16 5 / 31 0.215 0.9927.57
26/04/2018 15:00:00WSW 16 5 / 31 0.215 0.9930.54
26/04/2018 18:00:00SW 13 5 / 31 0.081 0.3731.65
26/04/2018 21:00:00SW 9 5 / 31 31.65
27/04/2018SW 7 5 / 31 31.65
27/04/2018 03:00:00SSW 7 5 / 31 31.65
27/04/2018 06:00:00S 4 5 / 31 31.65
27/04/2018 09:00:00SE 7 5 / 31 31.65
27/04/2018 12:00:00SSE 9 5 / 31 31.65
27/04/2018 15:00:00SSE 9 5 / 31 31.65
27/04/2018 18:00:00ESE 7 5 / 31 31.65
27/04/2018 21:00:00ESE 7 5 / 31 31.65
28/04/2018ESE 9 5 / 31 31.65
28/04/2018 03:00:00SE 7 5 / 31 31.65
28/04/2018 06:00:00NNE 9 5 / 31 31.65
28/04/2018 09:00:00N 11 5 / 31 31.65
28/04/2018 12:00:00N 11 5 / 31 31.65
28/04/2018 15:00:00NNE 11 5 / 31 31.65
28/04/2018 18:00:00NE 11 5 / 31 31.65
28/04/2018 21:00:00NE 9 5 / 31 31.65
Project Info
STANDFORD HILL Prison - Wind Farm on going work

Octocopter project wind turbine blade lift

PfR finishes construction of wind farm at HMP STANDFORD HILL
Partner for Renewables (PfR) has completed the construction of two 2.3MW wind turbines at HMP STANDFORD HILL, located on the Isle of Sheppey in Kent.

Flight safety fear over wind farm
That's the claim of commercial pilot Mike Loxton who was commenting on the plans for two 120 metre-high turbines at STANDFORD HILL prison in Church Road, Eastchurch.

Pre-construction works begin at HMP STANDFORD HILL on the Isle of Sheppey
Site preparations are now underway in advance of the construction of Partnerships for Renewables two-turbine wind energy development at HMP STANDFORD HILL, south of Eastchurch on the Isle of Sheppey.

©2018 Simon Mallett
Latest News Added
Wind farm aims to deliver 100m boost to South Lanarkshire economy
With construction of the 88MW Kype Muir Wind Farm, south of Strathaven, well underway, it is now estimated that the project will be worth more than 100m to the local economy.
Source: scotishconstruction, Date and Time of entry: 03 April 2018 00:00

Galloper offshore wind farm with 353MW capacity becomes fully operational
Construction of the 1.5bn wind farm began in November 2016. Full power generation was achieved on 29 March, as Siemens Gamesas last turbine was switched on.
Source: cleantech, Date and Time of entry: 03 April 2018 00:00

Blow me! Galloper wind farm off East Anglian coast hits full throttle
A 1.5bn wind farm off the coast of East Anglia has hit full throttle, just eighteen months after construction began.
Source: eadt, Date and Time of entry: 03 April 2018 00:00

First foundation installed for Aberdeen Bay wind farm
Vattenfall has released footage of the giant Asian Hercules crane vessel installing the first turbine foundation for the Aberdeen Bay wind farm.
Source: aberdeenjournals, Date and Time of entry: 03 April 2018 00:00

Glenfiddich owner loses Dorenell wind farm objection
William Grant and Sons objected to the Dorenell wind farm on the grounds it would spoil the local countryside and reduce visitor numbers.
Source: bbc, Date and Time of entry: 03 April 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom