Sorry I found no matches, Please try again.
Eccleshall Biomass Energy Sorry I found no matches, Please try again.
vid = 1954pws_id = 351612pws_id = 351612 Sorry I found no matches, Please try again.

--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.231.166.56YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Eccleshall Biomass Energy

Subscribers see an interactive map with Eccleshall Biomass Energy and local projects displayed.

( Subscribe for £100 )to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv and KML downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Eccleshall (Biomass , Active)

 General Information.

Location in the UK : Wales, Raleigh Hall, Stafford, ST21 6JL    
Type of installation: Biomass    on/offshore: on
Turbines :1  Capacity : 2.6 MW
Approx Date of 1st power generation: October 2007

/YES

 Comment

Eccleshall Biomass Limited: At the centre of this groundbreaking project is a 2.6 megawatt generator, fuelled by the energy crop "miscanthus", other energy crops and clean wood chip. The plant saves 1 tonne per hour of CO2 which would be emitted generating electricity from fossil fuel. Miscanthus is a non-invasive, sterile, perennial grass. It will be grown and harvested on local farms within a 25 mile radius of the Eccleshall Biomass Plant.

Residues from the plant will be in the form of ash at approx 1,100 tonnes per year (5% of fuel input) This will be used as fertiliser and spread on local farms.
RTB: Raleigh Hall / Talbotts Biomass Energy / BiEcc Ltd

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Eccleshall DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Eccleshall : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register
Project Info
Green plant to power up: ECCLESHALL
WORK on a green power plant is set to be completed within months. (2007)

The ECCLESHALL Biomass Story..
Case study of the development of a green power station

Tabotts Biomass Power

Staffordshire Biomass

ECCLESHALL Biomass

©2018 Simon Mallett
Latest News Added
Italys Eni to buy 20% stake in worlds largest offshore wind farm
Eni will now take a share of Dogger Bank A & Dogger Bank B, which will have a combined capacity of 2.4 gigawatts when fully operational. Upon completion of the deal, Equinor and SSEs share in Dogger Bank A & B will still amount to 40% each.
Date and Time of entry: 21 December 2020 00:00

14 MW GE Haliade-X for Third Phase
GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase Dogger Bank C offshore wind project.
Source: offshorewind, Date and Time of entry: 21 December 2020 00:00

EDF submits planning permission for first 50MW UK solar farm
EDF Renewables' 49.9MW Sutton Bridge solar farm has taken another step forward as its planning application goes before South Holland District Council.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with 49.9MW site planned
EDF Renewables is looking to develop a 49.9MW solar farm at Tye Lane near Bramford. The farm if granted planning permission would provide a community fund of up to 10,000 annually for its 35-year lifetime.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with another 50MW site announced
It is planning to develop the solar farm Bloys Grove on a site between the villages of Swainsthorpe and Mulbarton, just south of Norwich, in South Norfolk.
Source: spp, Date and Time of entry: 17 December 2020 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School