Not Logged on, Max pages: 5( 1 Seen ) ID:657 Ind:1
1 - 5 - YES *NO*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - NO

Subscribers see an interactive map with CAT Wind Farm and local projects displayed.

Subscribe for 100 to have full access to all Wind projects and details.
For an example of a Wind project see: Little Cheyene Court

Subscribe for 500 to include full csv downloads of all Wind farm project data.
To create a login account see: User Registration. This will allow 20 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT just one user

CAT Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Mid Wales - Machynlleth    
Type of installation: Wind    on/offshore: on
Turbines :0  Capacity : 0 MW
Approx Date of 1st power generation:

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

Centre for Alternative Technology

 Useful links and News items

(2005) Ireland's largest wind farm opens in Co Donegal - MeentyCAT
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.

Five-turbine Garth windfarm opens in Yell
It is hoped that the 4.5 megawatt project at Garth, which is loCATed between Basta Voe and Gloup, could eventually bring in over 1 million to the community once bank loans have been repaid.

Fair Head Tidal goes ahead with planning submission
Fair Head Tidal has lodged a planning appliCATion for permission to build tidal turbines on the seabed and associated infrastructure to bring the power ashore.

PLANNING APPROVAL UNANIMOUSLY GIVEN FOR CROSSDYKES WIND FARM
At a meeting of the Planning AppliCATions Committee on Tuesday 24th May, Councillors gave their unanimous backing to the 15 turbine wind farm, proposed by Muirhall Energy.

Crossdykes Wind Farm, Dumfries and Galloway
PBA was initially appointed by Muirhall Energy Limited to provide transport support for an appliCATion comprising 15 wind turbines (80m to hub height and 130m to blade tip) at Crossdykes in Dumfries and Galloway.

Relevant Google Search

 Generatror Details

Wind turbine make and model, hub height and elevation available on subscribed version

 Address

Subscribed version includes full address details of project site
Subscriber Register

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: CAT DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: CAT : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 

Data last updated: 26/02/2013 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| CAT | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 657