Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

Medwyn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, ML11 8HS    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: September 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

 Useful links and News items

Sorry I found no matches, Please try again.
Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

B H C Ltd Medwyn Park Edinburgh Road Carnwath ML11 8HS Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Medwyn )

 DECC Data on this Project: Medwyn : / 5279

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Medwyn: Wind :

Site Name: Medwyn Park
Generator Type: Wind
Scheme : REGO Generator ID: G02321NWSC
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 9/17/2015    
Applicant: BHC Ltd
Applicant Address: B H C LtdMedwyn ParkEdinburgh Road CarnwathLanarkML11 8HSScotland
Address: B H C LtdMedwyn ParkEdinburgh RoadCarnwathML11 8HSScotland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/11/2016 - 28/02/2017 00 457 95.21% Issued
01/10/2016 - 31/10/2016 00 62 12.92% Issued
01/09/2016 - 30/09/2016 00 112 23.33% Issued
01/08/2016 - 31/08/2016 00 88 18.33% Issued
01/08/2016 - 31/08/2016 00 88 18.33% Issued
01/07/2016 - 31/07/2016 00 81 16.88% Issued
01/06/2016 - 30/06/2016 00 46 9.58% Issued
01/05/2016 - 31/05/2016 00 101 21.04% Issued
01/04/2016 - 30/04/2016 00 86 17.92% Issued
Oct-16 00 62 12.92% Issued
Sep-16 00 112 23.33% Issued
Jul-16 00 81 16.88% Issued
June-16 00 46 9.58% Issued
May-16 00 101 21.04% Issued
Apr-16 00 86 17.92% Issued
Mar-16 00 84 17.50% Issued
Feb-16 00 125 26.04% Issued
Jan-16 00 145 30.21% Issued
Dec-15 00 191 39.79% Issued
Nov-15 00 142 29.58% Issued
Oct-15 00 63 13.13% Issued
Sep-15 00 16 3.33% Issued

 

Data last updated: 4/10/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Medwyn | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293