Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

OGP1 Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, MK16 9JX    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: August 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

 Useful links and News items

Sorry I found no matches, Please try again.
Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Dovecote FarmTurvey Road Astwood Newport Pagnell MK16 9JX England

 Associated Companies.

Relationship Company (For: OGP1 )
FinanceTemporis Capital LLP

 DECC Data on this Project: OGP1 : / 5268

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: OGP1: Wind :

Site Name: OGP1
Generator Type: Wind
Scheme : REGO Generator ID: G02802NWEN
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 8/28/2015    
Applicant: OGPW NO1 LIMITED
Applicant Address: 6 Charter GateClayfield CloseNORTHAMPTONNN3 6QFEngland
Address: Dovecote FarmTurvey RoadAstwoodNewport PagnellMK16 9JXEngland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2017 - 31/03/2017 00 187 38.96% Issued
01/02/2017 - 28/02/2017 00 164 34.17% Issued
01/01/2017 - 31/01/2017 00 126 26.25% Pending Tr
01/12/2016 - 31/12/2016 00 128 26.67% Issued
01/11/2016 - 30/11/2016 00 142 29.58% Issued
01/10/2016 - 31/10/2016 00 99 20.63% Issued
01/09/2016 - 30/09/2016 00 120 25.00% Issued
Aug-16 00 121 25.21% Issued
Jul-16 00 108 22.50% Issued
Oct-16 00 99 20.63% Pending Tr
Sep-16 00 120 25.00% Issued
Jul-16 00 108 22.50% Issued
Jun-16 00 67 13.96% Issued
May-16 00 117 24.38% Issued
Apr-16 00 110 22.92% Issued
Mar-16 00 150 31.25% Redeemed
Feb-16 00 185 38.54% Redeemed
Jan-16 00 207 43.13% Redeemed
Dec-15 00 276 57.50% Redeemed
Nov-15 00 206 42.92% Redeemed
Oct-15 00 90 18.75% Redeemed
Sep-15 00 81 16.88% Redeemed
Aug-15 00 4 0.83% Redeemed

 

Data last updated: 4/3/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| OGP1 | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293