Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

Stand Lees Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, OL11 5UN    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: December 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

 Useful links and News items

Sorry I found no matches, Please try again.
Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Stand Lees Farm Ashworth Road Rochdale OL11 5UN England

 Associated Companies.

Relationship Company (For: Stand Lees )
OperatorGVO WInd
FinanceTemporis Capital LLP

 DECC Data on this Project: Stand Lees : / 5259

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Stand Lees: Wind :

Site Name: Stand Lees
Generator Type: Wind
Scheme : REGO Generator ID: G02896NWEN
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 12/20/2015    
Applicant: GVO WIND NO. 31 LIMITED
Applicant Address: Temporis Capital LLPBerger House 36-38LondonW1J 5AEEngland
Address: Stand Lees FarmAshworth RoadRochdaleOL11 5UNEngland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2017 - 31/03/2017 00 169 35.21% Issued
01/02/2017 - 28/02/2017 00 159 33.13% Issued
01/01/2017 - 31/01/2017 00 117 24.38% Pending Tr
01/12/2016 - 31/12/2016 00 120 25.00% Issued
01/11/2016 - 30/11/2016 00 132 27.50% Issued
01/10/2016 - 31/10/2016 00 149 31.04% Issued
01/09/2016 - 30/09/2016 00 106 22.08% Issued
01/08/2016 - 31/08/2016 00 139 28.96% Issued
01/08/2016 - 31/08/2016 00 139 28.96% Issued
01/07/2016 - 31/07/2016 00 110 22.92% Issued
Oct-16 00 149 31.04% Pending Tr
Sep-16 00 106 22.08% Issued
Jul-16 00 110 22.92% Issued
June-16 00 69 14.38% Issued
May-16 00 152 31.67% Issued
Apr-16 00 140 29.17% Issued
Mar-16 00 133 27.71% Issued
Feb-16 00 172 35.83% Issued
Jan-16 00 165 34.38% Issued
Dec-15 00 62 12.92% Issued

 

Data last updated: 3/31/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Stand Lees | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293