Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

Millplough Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, DD10 0SU    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: January 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

 Useful links and News items

Sorry I found no matches, Please try again.
Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Millplough FarmInverbervie DD10 0SU Scotland

 Associated Companies.

Relationship Company (For: Millplough )
OperatorGVO WInd
FinanceTemporis Capital LLP

 DECC Data on this Project: Millplough : / 5256

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Millplough: Wind :

Site Name: Millplough Aug16
Generator Type: Wind
Scheme : REGO Generator ID: G02462NWSC
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 1/8/2016    
Applicant: GVO WIND NO. 43 LIMITED
Applicant Address: Temporis Capital LLPBerger House 36-38LondonW1J 5AEEngland
Address: Millplough FarmInverbervieDD10 0SUScotland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2017 - 31/03/2017 00 131 27.29% Issued
01/02/2017 - 28/02/2017 00 192 40.00% Issued
01/01/2017 - 31/01/2017 00 100 20.83% Issued
01/10/2016 - 31/10/2016 00 125 26.04% Issued
01/09/2016 - 30/09/2016 00 92 19.17% Pending Tr
01/08/2016 - 31/08/2016 00 133 27.71% Pending Tr

 

Data last updated: 3/31/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Millplough | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293