Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County





solar energy
SolarUK provides Solar Thermal & Solar PV for Industrial, Commercial and Domestic installations in the SouthEast of England.
01424 772 903
solar uk certificates

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

M M Crocker Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, BA8 0TN    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 0.774 MW
Approx Date of 1st power generation: September 2013

 Comment

2/2015/0898/FUL | Construct a Photovoltaic Park with associated equipment, including access track, cable route, substations, inverter stations, security cameras and perimeter fencing. | Land At E 371997 N 118399 Landshire Lane (West) Stalbridge Park Stalbridge Dorset

 Useful links and News items

Sorry I found no matches, Please try again.
Relevant Google Search cansee = YES

 Address

Landshire Country Foods Landshire Lane, Henstridge Somerset BA8 0TN England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: M M Crocker )

 DECC Data on this Project: M M Crocker : / 5231

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: M M Crocker: Solar :

Site Name: M M Crocker Limited
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G05137PVEN
Capacity: 774 Status: Live
Accreditation Date:    
Commission Date: 9/27/2013    
Applicant: M B Crocker Limited
Applicant Address: Seniors FarmNew StreetMarnhullSturminster NewtonDT10 1PZEngland
Address: Landshire Country FoodsLandshire Lane, HenstridgeSomersetBA8 0TNEngland
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 774kW 0.774 MW,
Thus over the month Capacity * 720 hours per month = 557.28 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

 

Data last updated: 4/25/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| M M Crocker | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293