Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

Nether Pratis Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, KY8 5NN    
Type of installation: Wind    on/offshore: on
Turbines :0  Capacity : 0.48 MW
Approx Date of 1st power generation: June 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

 Useful links and News items

Sorry I found no matches, Please try again.
Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Nether Pratis Farm Leven Fife KY8 5NN Scotland

 Associated Companies.

Relationship Company (For: Nether Pratis )
OperatorUrban Wind Ltd

 DECC Data on this Project: Nether Pratis : / 5187

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Nether Pratis: Wind :

Site Name: 2102047 Nether Pratis Wind
Generator Type: Wind
Scheme : REGO Generator ID: G02275NWSC
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 6/17/2015    
Applicant: Urban Wind Assets Ltd
Applicant Address: Urban Wind Assets Ltd100 Brompton RoadLondonSW3 1EREngland
Address: Nether Pratis FarmLevenFifeKY8 5NNScotland
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

 

Data last updated: 3/22/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Nether Pratis | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293