Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County

Map of 2 turbine locations can be seen by clicking here

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

Woodterril Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, EX18 7QF    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 0.492 MW
Approx Date of 1st power generation: September 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

1/0653/2013/FUL | Installation and operation of 2x 250kW (30m to hub and 45m to blade tip) wind turbines. | Woodterrill Farm Hollocombe Chulmleigh Devon EX18 7QF

 Useful links and News items

Planning Planning Application Documents

CPRE: WOODTERRILl Farm, Hollocombe

Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: WindTechnic WTN 250 Start Speed: 4
Capacity: 0.25 Optimal Speed: 14
Rotor Diameter: 30 Stop Speed: 25
Web Page: http://media.wix.com/ugd/59a83e_fb8cb324575a4f05b4bc1274bb466bfb.pdf
Comment:

 Address

Woodterril Farm Hollocombe Chumleigh EX18 7QF England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Woodterril )

 DECC Data on this Project: Woodterril : / 5025

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Woodterril: Wind :

Site Name: Woodterril Wind
Generator Type: Wind
Scheme : REGO Generator ID: G02838NWEN
Capacity: 492 Status: Live
Accreditation Date:    
Commission Date: 9/24/2015    
Applicant: JCR & SL Cowle
Applicant Address: Woodterrill FarmHollocombeCHULMLEIGHEX18 7QFEngland
Address: Woodterril FarmHollocombeChumleighEX18 7QFEngland
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 492kW 0.492 MW,
Thus over the month Capacity * 720 hours per month = 354.24 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

 

Data last updated: 2/3/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Woodterril | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 657