NO -/- YESWSHWS: ||||| showdata:YES HydroNot Logged on, Max pages: 5( Seen )

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County


energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading

Hunterston (Hydro , Agreed/Planning)

 General Information.

Location in the UK : Scotland, KA14 3DD    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 5 MW
Approx Date of 1st power generation:

 Comment

Scottish Enterprise Planning Permission Grant

 Useful links and News items

Turbine Testing at HUNTERSTON
Mitsubishi Heavy Industries, Ltd. (MHI) have begun onshore verification testing of a large-scale (MWT167H/7.0) digital hydraulically driven offshore wind turbine at the HUNTERSTON Test Centre1 in the United Kingdom.

SSE test site in HUNTERSTON, Scotland
The turbine of the type SWT-6.0-154 with 154 meter rotor diameter offers cutting edge direct drive technology.

Relevant Google Search cansee = YES

 Address

Caledonia Road Lochshore Ind Est, Glengarnock, Beith, Strathclyde. KA14 3DD

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Hunterston )

 DECC Data on this Project: Hunterston : / 4306

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hunterston     5 MW
Energy Type: Large Hydro
County: Strathclyde     Country: Scotland     LPA: North Ayrshire Council
Site ID and Reference: 369 / A0022     District:
Applicant: Scottish Enterprise     Application : 08/00576/PPP (Go to search to find Application)
Site Address: Caledonia Road Lochshore Ind Est, Glengarnock, Beith, Strathclyde. KA14 3DD
 
County: Strathclyde Region: Scotland
OS Coordinates: 232119 / 232119
Development Status: Planning Permission Granted
Application Submitted: 7/15/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 7/14/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hunterston: Hydro :

 

Data last updated: 8/9/2016 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Hunterston | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 70