Not Logged on, Max pages: 5( Seen ) *YES*

 Interactive Map of Renewable and Alternative Energy Projects in the UK



Login / Register / Subscribe



View All projects in this County

Map of 70 turbine locations can be seen by clicking here

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

the renewable exchange
Loading
- - - YES

Pen y Cymoedd Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, West of Aberdare    
Type of installation: Wind    on/offshore: on
Turbines :76  Capacity : 228 MW
Approx Date of 1st power generation: 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

Pen y Cymoedd Wind Energy Project is a 76 turbine wind energy project, located in South Wales. In May 2012 the project was granted consent by the Secretary of State for Energy.

The project is expected to be operational by 2016, and will have an installed capacity of up to 228MW.

 Useful links and News items

PEN Y CYMOEDD Wind Energy Project

PEN Y CYMOEDD: Nuon Renewables

Mynydd Llansadwrn Action Group

Contracts to supply PEN Y CYMOEDD wind farm awarded
Developers behind the largest onshore wind farm project in England and Wales have awarded two new multi-million pound contracts to supply chain companies.

Giant wind farm one step closer Between Aberdare and Neath
The planned PEN Y CYMOEDD wind farm would stretch between Aberdare and Neath on land south of the A465 Heads of the Valleys road.

Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: Siemens SWT 3.0-101 Start Speed: 4
Capacity: 3 Optimal Speed: 13
Rotor Diameter: 101 Stop Speed: 25
Web Page:
Comment:

 Address

Hwb Pen y Cymoedd Treherbert Road Treherbert Treorchy CF42 5SX Wales

 Associated Companies.

Relationship Company (For: Pen y Cymoedd )
DeveloperVattenfall

 DECC Data on this Project: Pen y Cymoedd : / 1994

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Pen Y Cymoedd     228 MW
Energy Type: Wind Onshore
County: Neath Port Talbot     Country: Wales     LPA: DECC (S36)
Site ID and Reference: 3742 / A0232     District:
Applicant: Vattenfall (previously Nuon Renewables)     Application : n/a (Go to search to find Application)
For Wind Farms  
Number of Turbines: 76 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 228
Site Address: Land stretches from the Upper Afan Valley to end of Cynon Valley.
 
County: Neath Port Talbot Region: Wales
OS Coordinates: 282793 / 282793
Development Status: Under Construction
Application Submitted: 11/19/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/6/2014    
Generator Live This Record Last Updated: 2/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Pen y Cymoedd: Wind :

Site Name: PyC Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00210RQWA
Capacity: 221681 Status: Live
Accreditation Date: 11/19/2009    
Commission Date: 10/10/2016    
Applicant: Pen y Cymoedd Wind Farm Limited
Applicant Address: Abbey WarehouseAbbey SlipPenzanceTR18 4AREngland
Address: Hwb Pen y CymoeddTreherbert RoadTreherbertTreorchyCF42 5SXWales

Site Name: PyC Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01627NWWA
Capacity: 221681 Status: Live
Accreditation Date: 11/19/2009    
Commission Date: 10/10/2016    
Applicant: Pen y Cymoedd Wind Farm Limited
Applicant Address: Abbey WarehouseAbbey SlipPenzanceTR18 4AREngland
Address: Hwb Pen y CymoeddTreherbert RoadTreherbertTreorchyCF42 5SXWales
 
Assumptions: Capacity: 221681kW 221.681 MW,
Thus over the month Capacity * 720 hours per month = 159610.32 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
Feb-17 00 43183 19.48% Issued
Jan-17 024581 27312 12.32% Issued
Dec-16 019066 21305 9.61% Issued
Nov-16 09394 10546 4.76% Issued
Oct-16 03049 3470 1.57% Issued

Site Name:
Generator Type:
Scheme : Generator ID:
Capacity: Status:
Accreditation Date: 11/19/2009    
Commission Date:    
Applicant:
Applicant Address:
Address:

 

Data last updated: 2/7/2017 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Pen y Cymoedd | on |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 657