Pentland Firth (Wave , Agreed/Planning)

 General Information.

Location in the UK : Scotland, Pentland Firth, North Scotland    
Type of installation: Wave    on/offshore: off
Turbines :4  Capacity : 6 MW
Approx Date of 1st power generation:

 Comment

ScottishPower Renewable Energy Limited (hereafter referred to as “ScottishPower Renewables”) is proposing to develop a Demonstration Tidal Array (hereafter referred to as the ‘Tidal Array’) in the Pentland Firth. The proposed Tidal Array would have a capacity in the range of 10-20MW of renewable power for export to the grid and would contribute to meeting the Scottish Government’s targets of providing 50% of Scotland’s electricity generation from renewable sources by 2020.

The Tidal Array would consist of up to 20 submerged demonstration tidal streamgenerating devices. The candidate demonstration tidal device will be based on an existing 300kw prototype device that is currently undergoing a period of research, development and testing. It is envisaged that the existing prototype will be developed to provide a larger scale demonstration device, in terms of potential output (1-1.5MW).

The Pentland Firth fills and drains the North Sea twice a day - water flows of up to 3 million tons a second.

 Useful links and News items

ANDRITZ HYDRO HAMMERFEST

PROJECT UPDATE

Tidal Stream

PENTLAND FIRTH Tidal Array Study

PENTLAND FIRTH - Tides

Relevant Google Search cansee = YES

 Address

 Associated Companies.

Relationship Company (For: Pentland Firth )
OwnerMeygen
DeveloperMeygen
OperatorMeygen
AgentScottish Power Renewables

 DECC Data on this Project: Pentland Firth : / 1867

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Inner Sound Phase 1A (MeyGen)     6 MW
Energy Type: Tidal Barrage and Tidal Stream
County: Offshore     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 1990 / B0899     District:
Applicant: Atlantis Resources     Application : n/a (Go to search to find Application)
Site Address: Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
 
County: Offshore Region: Offshore
OS Coordinates: 335503 / 335503
Development Status: Operational
Application Submitted: 7/19/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/21/2015    
Generator Live 2/20/2017 This Record Last Updated: 5/31/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Inner Sound Phase 1B (MeyGen)     79.1 MW
Energy Type: Tidal Barrage and Tidal Stream
County: Offshore     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4049 /     District:
Applicant: Atlantis Resources     Application : n/a (Go to search to find Application)
Site Address: Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
 
County: Offshore Region: Offshore
OS Coordinates: 335503 / 335503
Development Status: Planning Permission Granted
Application Submitted: 7/19/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 5/31/2017
RO Banding (ROC/MWh) 2 FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Pentland Firth: Wave :

 

Data last updated: 10/25/2016 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Pentland Firth | off |
solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293