Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 2007
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.227.233.55
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Laatsa Wind Farm Wind 3 Estonia Saare maakond 0 / 2007 18/07/2019  
 1
  Türju Wind Farm Wind 0.3 Estonia Saare maakond 0 / 2007 18/07/2019  
 1
  Sangla Wind Farm Wind 0.3 Estonia Tartu maakond 0 / 2007 18/07/2019  
 1
  Nasva Wind Farm Wind 3.9 Estonia Saare maakond 0 / 2007 06/08/2019  
 1
  Zeebiestocht Wind Farm Wind 23 Holland Netherlands 0 / 2007 16/04/2019  
 1
  Aberthaw Biomass 0 Wales Glamorgan 0 / 2007 22/01/2016  
 1
  Roxwell Waste 1.26 England CM1 4LT Essex 0 / 2007 08/10/2016  
 1
  Tournafulla Wind Farm Wind 27 s.ireland Co. Limerick 1 / 2007 12/10/2017  
 1
  Yaddlethorpe 0.625 England DN17 2BU West Yorkshire 1 / 2007 21/02/2017  
 1
  Viru-Nigula Wind Farm Wind 24 Estonia Lääne-Viru maakond 1 / 2007 16/07/2019  
 1
  Cotesbach Waste 3.5 England LE17 6AA Leicestershire 1 / 2007 07/11/2016  
 1
  Studley Grange Waste 0.96 England SN4 9QT Wiltshire 1 / 2007 08/11/2016  
 1
  Hameldon Hill Wind Farm Wind 4.5 England BB11 5QJ Lancashire 2 / 2007 13/08/2016  
 1
  Burgar Hill Wind Farm Wind 5 Scotland Orkney 2 / 2007 29/01/2017  
 1
  Black Hill Wind Farm Wind 28.6 Scotland Strathclyde 2 / 2007 14/07/2017  
 1
  Braes of Doune Wind Farm Wind 72 Scotland Stirlingshire 2 / 2007 16/11/2016  
 1
  New Barn Farm Wind Farm Wind 4.5 England BB11 5QQ Lancashire 2 / 2007 13/08/2016  
 1
  Lower Melville Waste 1 Scotland KY15 7UL Fife 2 / 2007 20/02/2017  
 1
  Wilton Biomass 35.2 England TS90 8WS Cleveland 3 / 2007 25/05/2017  
 1
  Bindoo Wind Farm Wind 48 s.ireland Co. Cavan 3 / 2007 28/09/2017  
 1
  High Sharpley Wind Farm Wind 2.6 England Co. Durham 3 / 2007 10/08/2016  
 1
  Red Tile Wind Farm Wind 24 England Cambridgeshire 3 / 2007 24/11/2016  
 1
  High Pow Wind Farm Wind 3.9 England CA7 8NH Cumbria 3 / 2007 11/07/2016  
 1
  Dummuie Wind Farm Wind 10.4 Scotland AB54 4RL Aberdeenshire 4 / 2007 14/04/2015  
 1
  Technium Optic Solar Farm Solar 0.085 Wales Denbighshire 4 / 2007 28/09/2016  
 1
  Albion Square Solar Farm Solar 0.073 England GU21 6EJ Surrey 4 / 2007 28/09/2016  
 1
  Wether Wind Farm Wind 18.2 Scotland Dumfries & Galloway 5 / 2007 10/07/2016  
 1
  Ranson Moor Wind Farm Wind 10 England PE15 OTY Cambridgeshire 5 / 2007 30/05/2018  
 1
  Forss Wind Farm Wind 7.2 Scotland Caithness 5 / 2007 11/12/2016  
 1
  Skelton Grange Waste 5.206 England LS15 9AD Yorkshire 5 / 2007 06/10/2016  
 1
  Greencastle Wind Farm Wind 2.5 N.Ireland Co. Tyrone 7 / 2007 13/04/2018  
 1
  Midas Wind Farm Wind 32.24 s.ireland Co. Kerry 7 / 2007 01/12/2017  
 1
  Beatrice Wind Farm Wind 10 Scotland AB10 6BZ Caithness 7 / 2007 06/08/2019  
 1
  Hill of Easterton Wind Farm Wind 2.5 Scotland Aberdeenshire 7 / 2007 16/11/2016  
 1
  Meadow Hall Waste 1.11 England Yorkshire 7 / 2007 08/11/2016  
 1
  Hill of Balquhindachy Wind Farm Wind 2.55 Scotland AB41 7BY Aberdeenshire 7 / 2007 20/03/2015  
 1
  Lough Hill Wind Farm Wind 7.8 N.Ireland BT82 9JW Co. Tyrone 7 / 2007 04/05/2015  
 1
  Wharrels Hill Wind Farm Wind 10.4 England Cumbria 8 / 2007 20/10/2014  
 1
  Bristol Port Wind Farm Wind 6 England BS11 9DQ Avon 8 / 2007 14/12/2016  
 1
  Bin Mountain Wind Farm Wind 9 N.Ireland BT81 7QY Co. Tyrone 9 / 2007 11/04/2015  
 1
  Craig Wind Farm Wind 8 Scotland DG13 0NZ Dumfries & Galloway 9 / 2007 06/02/2017  
 1
  Wilton Biomass 35 England TS23 1PY Co. Durham 9 / 2007 13/03/2017  
 1
  Withyhedge Waste 2.422 Wales SA62 4DB Dyfed 9 / 2007 29/10/2016  
 1
  Horton Waste 1.825 Wales BN5 9XN Sussex 10 / 2007 21/02/2017  
 1
  Stags Holt Wind Farm Wind 18 England PE15 0DR Cambridgeshire 10 / 2007 25/03/2016  
 1
  South View Farm Biomass 2 England YO18 8J North Yorkshire 10 / 2007 25/05/2017  
 1
  Burbo Bank Wind Farm Wind 90 England Merseyside 10 / 2007 16/04/2018  
 1
  Eccleshall Biomass 2.6 Wales 10 / 2007  
 1
  Hull Waste Water Wind Farm Wind 1.3 England HU12 8EY Humberside 11 / 2007 30/12/2016  
 1
  River E Hydro 3 Scotland IV2 6UL Highland 11 / 2007 23/05/2017  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

How to become a solar farm manager: Manish's story
Now Manish manages ten solar farm sites across the UK, which are fields of solar panels storing and converting energy from the sun
Source: bbc, Date and Time of entry: 18 September 2019 00:00

Doncaster Sheffield Airport plans £2m solar farm to cut emissions
Doncaster Airport (DSA) said renewable energy could generate 25% of its energy and would also
Source: bbc, Date and Time of entry: 18 September 2019 00:00

1.7MWp ground-mounted solar farm to be built at Doncaster Sheffield Airport
The £2 million ground-mounted farm is set to open in 2020. The Peel Group is currently reviewing the best path to delivering the project, which it claims could supply up to 4MW of green power.
Source: spp, Date and Time of entry: 18 September 2019 00:00

BayWa r.e. boasts ‘exciting plans’ for UK renewables as O&M portfolio tops 2GW
BayWa r.e. has amassed 2GW in its solar and wind management portfolio since entering the UK O&M market in 2017.
Source: spp, Date and Time of entry: 18 September 2019 00:00

York set for 400kW ‘HyperHub’ solar carport with storage.
Monks Cross carport backed up with battery storage is set to be built in York as part of its 'HyperHubs' project.The solar carport has a proposed generation capacity of up to 400kW, powering a mix of 160kW and 7kW electric vehicle (EV) chargers.
Source: spp, Date and Time of entry: 18 September 2019 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.