Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 2006
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Braevallich Hydro 2.2 Scotland PA 33 1BU Argyllshire 0 / 2006 30/09/2016  
 1
  Sorne Hill Wind Farm Wind 38 SIreland Co. Donegal 0 / 2006 18/09/2017  
 1
  Black Law Wind Farm Wind 97 Scotland ML11 8EW Lanarkshire 1 / 2006 22/11/2016  
 1
  Blackborough End Waste 1.519 England CM1 4LT Norfolk 1 / 2006 30/10/2016  
 1
  Avondale Waste 4 Scotland Strathclyde 1 / 2006  
 1
  Mynydd Clogau Wind Farm Wind 14.45 Wales SY21 0AJ Montgomeryshire 1 / 2006 10/12/2016  
 1
  Arlesey Waste 1.08 England SG15 6RF Bedfordshire 1 / 2006 30/10/2016  
 1
  Nant-y-Gwyddon Waste 0.95 Wales CF41 7TL Mid Glamorgan 1 / 2006 21/02/2017  
 1
  Taurbeg Wind Farm Wind 25.3 SIreland Co. Cork 1 / 2006 21/09/2017  
 1
  Squabb Wood Waste 1 England SO51 6GA Hampshire 1 / 2006 21/02/2017  
 1
  Springfield Waste 1.4 England HP9 1XD Buckinghamshire 1 / 2006 20/02/2017  
 1
  Cathkin Waste 7.39 Scotland Strathclyde 1 / 2006 06/10/2016  
 1
  Capel Waste 1.03 England RH 5 5JL Surrey 2 / 2006 10/12/2016  
 1
  SILENT VALLEY LANDFILL Waste 1.93 Wales NP3 6PZ Gwent 3 / 2006 06/09/2017  
 1
  Actrees Solar Farm Solar 5 England GL13 9PP Gloucestershire 3 / 2006 12/11/2016  
 1
  Hadyard Hill Wind Farm Wind 120 Scotland KA26 9TH Ayrshire 3 / 2006 10/01/2016  
 1
  Findhorn Wind Farm Wind 0.75 Scotland IV36 3TZ Inverness-shire 3 / 2006 30/12/2016  
 1
  Fair Oak Waste 1.5 England Hampshire 4 / 2006 20/02/2017  
 1
  Mynydd Cemaes v2 Delete 14.45 Wales 4 / 2006  
 1
  Pauls Hill Wind Farm Wind 64.4 Scotland AB37 9BS Morayshire 4 / 2006 03/06/2016  
 1
  Burton Wold Wind Farm Wind 20 England NN9 5HW Northamptonshire 4 / 2006 30/08/2016  
 1
  Boyndie Wind Farm Wind 16 Scotland AB45 2LR Grampian 5 / 2006 18/11/2016  
 1
  Farr Wind Farm Wind 92 Scotland Inverness-shire 5 / 2006 16/11/2016  
 1
  Michelin Dundee Wind Farm Wind 4 Scotland Tayside 5 / 2006 30/12/2016  
 1
  Deerplay Waste 0.988 England B11 3RL Lancashire 5 / 2006 07/11/2016  
 1
  Burnhills Waste 5.2 England NE21 4SX Tyne and Wear 5 / 2006 16/12/2016  
 1
  Vigo Utopia Waste 2 Wales WS9 8YB Aberdeenshire 6 / 2006 21/02/2017  
 1
  Wardlaw Wood Wind Farm Wind 18 Scotland KA24 5HR Ayrshire 6 / 2006 13/01/2015  
 1
  Gedney Marsh Wind Farm Wind 12 England Lincolnshire 7 / 2006 22/11/2016  
 1
  Barrow Wind Farm Wind 90 England Cumbria 7 / 2006 21/10/2016  
 1
  Deeping St Nicholas Wind Farm Wind 16 England Lincolnshire 7 / 2006 01/12/2014  
 1
  Caton Moor Wind Farm Wind 16 England Lancashire 7 / 2006 05/11/2014  
 1
  Clifton Marsh Waste 2.695 England PR4 OXE Lancashire 7 / 2006 16/10/2016  
 1
  Lodge Farm Wind Farm Wind 1 Wales Dyfed 8 / 2006 05/06/2017  
 1
  Sandy Lane Waste 2 England B61 0QT Worcestershire 8 / 2006 20/02/2017  
 1
  Black Law B Delete 27.6 Wales 9 / 2006  
 1
  Lochhead Fife Waste 2 Scotland KY12 0RX Fife 9 / 2006 19/12/2016  
 1
  Sutton Courtenay Waste 6 England OX14 4PW Oxfordshire 10 / 2006 06/10/2016  
 1
  Workington Wind Farm Wind 4 England CA14 1LG Cumbria 10 / 2006 30/12/2016  
 1
  Ponts Mill Hydro 0.2 England PL30 5DR Cornwall 11 / 2006 04/01/2015  
 1
  Arnish Moor Wind Farm Wind 3.9 Scotland HS2 9NH Highland 11 / 2006 18/02/2015  
 1
  North Pickenham Wind Farm Wind 14.4 England PE37 7QT Norfolk 11 / 2006 11/08/2016  
 1
  Bamber Wind Farm Wind 9.6 England LN12 2QW Lincolnshire 11 / 2006 18/11/2016  
 1
  North Herts Waste 1.5 England SG5 3RT Hertfordshire 11 / 2006 20/02/2017  
 1
  Houghton-le-Spring Waste 3 England DH4 4AU Tyne and Wear 12 / 2006 22/10/2016  
 1
  Oatslie Waste 2 Scotland EH25 9QN Lothian 12 / 2006 19/12/2016  
 3
  Rushton Waste 0.99 England NN14 1RS Northamptonshire 1 / 2006 24/10/2016  
 9
  Hafoty Ucha 3 extension Delete 0.85 Scotland Aberdeenshire 1 / 2006 18/11/2016  
 9
  Rushton Delete 0.99 England NN14 1RS Northamptonshire 1 / 2006 29/10/2016  
 9
  Sandy Lane Delete 0 England RM15 4HL Essex 8 / 2006 30/10/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Wind farm being sued by families admits its liability
The case against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.