Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1999
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  JUDKINS Waste 2.73 England CV10 0HU Warwickshire 1 / 1999 28/10/2016  
 1
  Burnt Stump Waste 0.963 England NG5 8PR Nottinghamshire 1 / 1999 18/10/2016  
 1
  Whinney Hill Waste 2.7 England BB5 6NN Lancashire 1 / 1999 29/10/2016  
 1
  Bernard Road Waste 2.1 England S4 7YX Yorkshire 1 / 1999 12/12/2016  
 1
  HILL AND MOOR Waste 3.38 England WR10 2PW Worcestershire 3 / 1999 28/10/2016  
 1
  Boston Waste 1.275 England PE21 7AA Lincolnshire 3 / 1999 01/11/2016  
 1
  BURNTSTUMP Waste 1.8 England NG5 8PR Nottinghamshire 4 / 1999 08/10/2016  
 1
  Royal Seaforth Dock Wind Farm Wind 3.6 England L20 1BG Merseyside 4 / 1999 17/06/2016  
 1
  Beinn Ghlas Wind Farm Wind 8.4 Scotland PA35 1HY Argyllshire 5 / 1999 11/10/2016  
 1
  Thetford Biomass 38.5 England Norfolk 6 / 1999 06/10/2016  
 1
  Enderby Warren Waste 4.875 England LE9 5AL Leicestershire 6 / 1999 06/10/2016  
 1
  Far Old Park Wind Farm Wind 4.62 England LA16 7UD Cumbria 7 / 1999 15/11/2016  
 1
  Summerston Waste 2.78 Scotland G23 5HD Strathclyde 7 / 1999 28/10/2016  
 1
  ECOTECH Wind Farm Wind 1.47 England PE37 7HT Norfolk 8 / 1999 27/02/2016  
 1
  Bromborough Waste 2.95 England L62 4SQ Cheshire 9 / 1999 18/05/2017  
 1
  Station Farm Waste 1.956 England PE18 9UH Cambridgeshire 9 / 1999 11/11/2016  
 1
  EcoTech Wind Farm Wind 1.5 England PE37 7HT Norfolk 10 / 1999 21/02/2016  
 1
  Ufton Waste 0.93 Wales CV33 9PP Warwickshire 11 / 1999 20/02/2017  
 1
  Croesor Hydro 0.5 Scotland LL48 655 Aberdeenshire 11 / 1999 30/09/2016  
 1
  Beeston Weir Hydro 1.66 England NG11 8NB Nottinghamshire 12 / 1999 05/01/2017  
 1
  Winscales Wind Farm Wind 7.3 England CA14 4JG Cumbria 12 / 1999 18/11/2016  
 1
  Tarn Bank Wind Farm Wind 0.845 England CA14 4JG Cumbria 12 / 1999 05/01/2017  
 9
  Askam Delete 2.303 England LA16 7UD Cumbria 7 / 1999 15/11/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Wind farm being sued by families admits its liability
The case against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.