Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1998
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Huddersfield Waste 9.5 England HD1 6NT Yorkshire 0 / 1998 05/10/2016  
 1
  TYTHEGSTON Waste 1.175 Wales CF32 0NE Breconshire 1 / 1998 20/02/2017  
 1
  FFESTINIOG Hydro 0.7 Wales LL41 4PB Merionethshire 1 / 1998 05/01/2017  
 1
  Ellington Waste 0.945 England NE65 9XR Northumberland 1 / 1998 01/11/2016  
 1
  Bidstone Moss Waste 2.34 England CH44 2HE Merseyside 1 / 1998 30/10/2016  
 1
  Stoke 14.2 England ST4 4DX Staffordshire 1 / 1998 05/10/2016  
 1
  Stewartby Waste 10.66 England MK43 9LY Bedfordshire 1 / 1998 06/10/2016  
 1
  Seghill Village Waste 1.422 England NE23 7DY Northumberland 2 / 1998 16/10/2016  
 1
  Meece Landfill Waste 1.75 Wales 3 / 1998  
 1
  Crockahenny Wind Farm Wind 5 SIreland Co. Donegal 4 / 1998 18/09/2017  
 1
  COXHOE Waste 3.8 England DH6 4RT Co. Durham 4 / 1998 06/09/2017  
 1
  Billinge Hill Quarry Waste 1 England WN5 7PF Merseyside 4 / 1998 30/10/2016  
 1
  Teesside Waste 20.069 England TS23 1PY Cleveland 5 / 1998 05/10/2016  
 1
  BEDDINGHAM Waste 1.109 England BN8 6JS East Sussex 5 / 1998 05/10/2016  
 1
  Bradgate Waste 2.47 England LE12 9BV Leicestershire 7 / 1998 06/07/2015  
 1
  DULYN WEIR Hydro 0.5 England LL32 8SH Cheshire 8 / 1998 14/07/2016  
 1
  Hafotty Ucha Wind Farm Wind 0.6 Wales Gwynedd 9 / 1998 18/11/2016  
 1
  Kibblesworth Waste 2.34 England NE11 0TW Co. Durham 10 / 1998 01/11/2016  
 1
  Pilsworth Waste 7 England BL9 7JL Lancashire 10 / 1998 16/10/2016  
 1
  Chelson Meadow Waste 3.18 England PL9 7JA Devon 10 / 1998 06/10/2016  
 1
  Lamby Way Waste 4 Wales CF3 2HP South Glamorgan 11 / 1998 15/10/2016  
 1
  Warren Waste 1.902 England LE9 3JL Leicestershire 11 / 1998 24/10/2016  
 1
  Slievenahanaghan Wind Farm Wind 1 N.Ireland BT44 9JE Co. Londonderry 11 / 1998 13/06/2016  
 3
  Arbre Biomass 8 England Yorkshire 0 / 1998 03/07/2015  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Wind farm being sued by families admits its liability
The case against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.