Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1998
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Huddersfield Waste 9.5 England HD1 6NT Yorkshire 0 / 1998 05/10/2016  
 1
  TYTHEGSTON Waste 1.175 Wales CF32 0NE Breconshire 1 / 1998 20/02/2017  
 1
  Stewartby Waste 10.66 England MK43 9LY Bedfordshire 1 / 1998 06/10/2016  
 1
  Bidstone Moss Waste 2.34 England CH44 2HE Merseyside 1 / 1998 30/10/2016  
 1
  FFESTINIOG Hydro 0.7 Wales LL41 4PB Merionethshire 1 / 1998 05/01/2017  
 1
  Ellington Waste 0.945 England NE65 9XR Northumberland 1 / 1998 01/11/2016  
 1
  Stoke 14.2 England ST4 4DX Staffordshire 1 / 1998 05/10/2016  
 1
  Seghill Village Waste 1.422 England NE23 7DY Northumberland 2 / 1998 16/10/2016  
 1
  Meece Landfill Waste 1.75 Wales 3 / 1998  
 1
  Billinge Hill Quarry Waste 1 England WN5 7PF Merseyside 4 / 1998 30/10/2016  
 1
  Crockahenny Wind Farm Wind 5 s.ireland Co. Donegal 4 / 1998 18/09/2017  
 1
  COXHOE Waste 3.8 England DH6 4RT Co. Durham 4 / 1998 06/09/2017  
 1
  BEDDINGHAM Waste 1.109 England BN8 6JS East Sussex 5 / 1998 05/10/2016  
 1
  Teesside Waste 20.069 England TS23 1PY Cleveland 5 / 1998 05/10/2016  
 1
  Bradgate Waste 2.47 England LE12 9BV Leicestershire 7 / 1998 06/07/2015  
 1
  DULYN WEIR Hydro 0.5 England LL32 8SH Cheshire 8 / 1998 14/07/2016  
 1
  Hafotty Ucha Wind Farm Wind 0.6 Wales Gwynedd 9 / 1998 18/11/2016  
 1
  Kibblesworth Waste 2.34 England NE11 0TW Co. Durham 10 / 1998 01/11/2016  
 1
  Chelson Meadow Waste 3.18 England PL9 7JA Devon 10 / 1998 06/10/2016  
 1
  Pilsworth Waste 7 England BL9 7JL Lancashire 10 / 1998 16/10/2016  
 1
  Warren Waste 1.902 England LE9 3JL Leicestershire 11 / 1998 24/10/2016  
 1
  Slievenahanaghan Wind Farm Wind 1 N.Ireland BT44 9JE Co. Londonderry 11 / 1998 13/06/2016  
 1
  Lamby Way Waste 4 Wales CF3 2HP South Glamorgan 11 / 1998 15/10/2016  
 3
  Arbre Biomass 8 England Yorkshire 0 / 1998 03/07/2015  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Dunsland Cross residents say new wind turbines have a ‘devastating’ impact
The application was received on Wednesday, December 21, 2011. It was highly contested by locals, with over 400 comments being posted on Torridge District Council’s planning website. The application was later denied.
Source: budetoday, Date and Time of entry: 10 November 2017 00:00

Senvion concludes 33 megawatt contract with Innogy Renewables UK Ltd.
Hamburg/Edinburgh: Senvion, a leading global manufacturer of wind turbines, has signed a contract with Innogy Renewables UK Ltd. to supply 16 wind turbines from its two megawatts (MW) series for the Mynydd y Gwair wind farm in South Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

Senvion grabs RWE contract
RWE has confirmed it has awarded a contract to German turbine supplier Senvion to supply all 28 turbines to its 57.4MW Brechfa Forest West Wind Farm in Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

to-the-point: RWE in Wales awards 57.4-MW turbine order to Senvion
Under the deal, financial details on which were not revealed, Senvion will supply 28 units of 2.05-MW turbines with a maximum tip height of up to 145 metres.
Source: renewablesnow, Date and Time of entry: 10 November 2017 00:00

Proposal to build Britain’s biggest solar farm near Whitstable (Cleve Hill)
Developers have today unveiled plans to blanket 890 acres of farmland near Graveney with the energy-producing panels.
Source: kentonline, Date and Time of entry: 09 November 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.