Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1995
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Blantyre Hydro 0.575 Scotland G72 9BX East Lothian 0 / 1995 30/09/2016  
 1
  Rigged Hill Wind Farm Wind 5 N.Ireland Co. Londonderry 3 / 1995 18/11/2016  
 1
  Borrowash Mill Hydro 0.179 England DE72 3LJ Derbyshire 4 / 1995 05/01/2017  
 1
  Elliots Hill Wind Farm Wind 5 N.Ireland Co. Antrim 4 / 1995 06/05/2015  
 1
  Four Burrows Wind Farm Wind 4.5 England Cornwall 5 / 1995 31/03/2016  
 1
  Distington Landfill Waste 1.778 England CA15 4JY Cumbria 6 / 1995 01/11/2016  
 1
  BUTCHERSFIELD Waste 2.874 England WA3 6EW Cheshire 10 / 1995 11/03/2016  
 1
  Old Walls Hydro 0.076 England TQ13 7PN Devon 12 / 1995 05/01/2017  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Decoy Farm AD Plant
SES Contracting were awarded the construction of a new 2.8mw Anaerobic Digestion plant at Decoy Farm, Crowland near Peterborough.
Source: ses group, Date and Time of entry: 16 August 2017 00:00

FAIR HEAD TIDAL TO REVEAL LATEST PLANS TO BALLYCASTLE AND RATHLIN COMMUNITIES
The renewable energy firm behind proposals to install a tidal generation scheme off Fair Head is to host two open days to gather opinions and share information with local communities.
Source: dpenergy, Date and Time of entry: 10 August 2017 00:00

Fair Head Tidal goes ahead with planning submission
Fair Head Tidal has lodged a planning application for permission to build tidal turbines on the seabed and associated infrastructure to bring the power ashore.
Source: irishnews, Date and Time of entry: 10 August 2017 00:00

Gruggandoo Wind Farm April 2017
The proposed scheme would have an installed capacity of 39.6MW, comprising 12 turbines, each with a maximum blade tip height of 125m and a hub height of 75m. Access to the site will be taken from Mullgahgarriff Road for all turbines.
Source: abo, Date and Time of entry: 02 August 2017 00:00

PLANNING APPROVAL UNANIMOUSLY GIVEN FOR CROSSDYKES WIND FARM
At a meeting of the Planning Applications Committee on Tuesday 24th May, Councillors gave their unanimous backing to the 15 turbine wind farm, proposed by Muirhall Energy.
Source: muirhall, Date and Time of entry: 02 August 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.