Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1995
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.234.214.113
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Blantyre Hydro 0.575 Scotland G72 9BX East Lothian 0 / 1995 30/09/2016  
 1
  Rigged Hill Wind Farm Wind 5 N.Ireland Co. Londonderry 3 / 1995 18/11/2016  
 1
  ElliotsHill Wind Farm Wind 5 N.Ireland Co. Antrim 4 / 1995 03/12/2017  
 1
  Borrowash Mill Hydro 0.179 England DE72 3LJ Derbyshire 4 / 1995 05/01/2017  
 1
  Four Burrows Wind Farm Wind 4.5 England Cornwall 5 / 1995 31/03/2016  
 1
  Distington Landfill Waste 1.778 England CA15 4JY Cumbria 6 / 1995 01/11/2016  
 1
  BUTCHERSFIELD Waste 2.874 England WA3 6EW Cheshire 10 / 1995 11/03/2016  
 1
  Old Walls Hydro 0.076 England TQ13 7PN Devon 12 / 1995 05/01/2017  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

MHI Vestas secures Seagreen turbine gig
MHI Vestas has entered into a preferred supplier agreement to supply and service up to 114 wind turbines for the 1100MW Seagreen offshore wind farm being built in Scottish waters.
Source: renews, Date and Time of entry: 18 October 2019 00:00

Corbyn says Fife wind farm contract plan -not credible
Jeremy Corbyn says plans to manufacture parts for a 2bn wind farm off the Fife coast at a site thousands of miles away are not credible.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Noisy wind farm extension paused after Barrow residents object
Residents claiming a nearby wind farm has been noisy for 20 years have convinced councillors to pause plans to keep it open for another decade.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Glenshimmeroch wind farm project approved on appeal
A 10-turbine wind farm in southern Scotland has been approved on appeal. Developers Energiekontor took the case to the Scottish government over Dumfries and Galloway Council's failure to issue a decision.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Workers at Isle of Lewis BiFab yard to lose jobs
Workers at a fabrication yard, which was brought back into use just six months ago, have been told they will not have their contracts renewed.
Source: bbc, Date and Time of entry: 14 October 2019 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.