Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1959
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.227.233.55
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Orrin 18 Scotland Highland 1 / 1959 09/08/2016  
 1
  Cassley Hydro 10 Scotland IV27 4NY Sutherland 1 / 1959 09/08/2016  
 1
  Cuaich Hydro 2.5 Scotland PH19 1AF Highland 1 / 1959 19/05/2017  
 1
  Lairg Hydro 3.5 Scotland Highland 1 / 1959 18/05/2017  
 1
  Lairg Hydro 3.5 Scotland Highland 1 / 1959 18/05/2017  
 1
  Trinafour Hydro 0.5 Scotland Perth 1 / 1959 30/09/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

How to become a solar farm manager: Manish's story
Now Manish manages ten solar farm sites across the UK, which are fields of solar panels storing and converting energy from the sun
Source: bbc, Date and Time of entry: 18 September 2019 00:00

Doncaster Sheffield Airport plans £2m solar farm to cut emissions
Doncaster Airport (DSA) said renewable energy could generate 25% of its energy and would also
Source: bbc, Date and Time of entry: 18 September 2019 00:00

1.7MWp ground-mounted solar farm to be built at Doncaster Sheffield Airport
The £2 million ground-mounted farm is set to open in 2020. The Peel Group is currently reviewing the best path to delivering the project, which it claims could supply up to 4MW of green power.
Source: spp, Date and Time of entry: 18 September 2019 00:00

BayWa r.e. boasts ‘exciting plans’ for UK renewables as O&M portfolio tops 2GW
BayWa r.e. has amassed 2GW in its solar and wind management portfolio since entering the UK O&M market in 2017.
Source: spp, Date and Time of entry: 18 September 2019 00:00

York set for 400kW ‘HyperHub’ solar carport with storage.
Monks Cross carport backed up with battery storage is set to be built in York as part of its 'HyperHubs' project.The solar carport has a proposed generation capacity of up to 400kW, powering a mix of 160kW and 7kW electric vehicle (EV) chargers.
Source: spp, Date and Time of entry: 18 September 2019 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.