Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1957
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 34.237.124.210
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Sron Mor Hydro 5 Scotland PA32 8XH Highland 1 / 1957 09/08/2016  
 1
  St Fillans Hydro 16.83 Scotland PH6 2NG Highland 1 / 1957 23/11/2017  
 1
  Mossford Hydro 247 Scotland IV23 2PZ Inverness-shire 1 / 1957 06/09/2017  
 9
  Great Glen Scheme Delete 36 Scotland Highland 1 / 1957 20/12/2018  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Italy’s Eni to buy 20% stake in world’s largest offshore wind farm
Eni will now take a share of Dogger Bank A & Dogger Bank B, which will have a combined capacity of 2.4 gigawatts when fully operational. Upon completion of the deal, Equinor and SSE’s share in Dogger Bank A & B will still amount to 40% each.
Date and Time of entry: 21 December 2020 00:00

14 MW GE Haliade-X for Third Phase
GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase Dogger Bank C offshore wind project.
Source: offshorewind, Date and Time of entry: 21 December 2020 00:00

EDF submits planning permission for first 50MW UK solar farm
EDF Renewables' 49.9MW Sutton Bridge solar farm has taken another step forward as its planning application goes before South Holland District Council.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with 49.9MW site planned
EDF Renewables is looking to develop a 49.9MW solar farm at Tye Lane near Bramford. The farm – if granted planning permission – would provide a community fund of up to £10,000 annually for its 35-year lifetime.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with another 50MW site announced
It is planning to develop the solar farm – Bloy’s Grove – on a site between the villages of Swainsthorpe and Mulbarton, just south of Norwich, in South Norfolk.
Source: spp, Date and Time of entry: 17 December 2020 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.